SmartFactoryAPS · Production Planning Control Tower

R1 v1.14 PILOT · Supabase PostgreSQL shared-workspace sync · IndexedDB device storage · Per-lot routing · Factory cycle-time setup · Whole-panel m² + assembly pcs · 500 FPC families / 1,000 FPC–FPCA variants + PCBA routes
SYNTHETIC DATA · NOT LIVE FACTORY APS
Already have important orders in APS R1.12? Open your OLD R1.12 first, choose Backup JSON, then open this new R1.14 and choose Restore scenario JSON before your first Supabase connection. Moving to an HTTPS website changes the browser storage location, so existing old-page orders cannot migrate automatically across website origins. Confirm the correct lot count before clicking Connect & sync.

☁ Private multi-device planning

Your orders are saved on this device. Connect an optional private cloud account to move between phones and notebook.

Device save: checking…Device only
Decision safeguard: Default limits are 400 m²/workday for fabrication and 4,000 pcs/workday for assembly; whole fabrication panels (ceil(starts / UP) × panel m²) are scheduled. The product and panel dimensions are illustrative, not MFS actual data. A lot with no sufficient material and no supply ETA is labelled NO MATERIAL DATE; a lot dependent on an unconfirmed supplier delivery is TENTATIVE SUPPLY. An earliest feasible calculated date is a planning estimate, not a customer-approved promise. Existing WIP is assumed material-issued; only additional starts are gated against the simplified material ledger. Detailed station quantity-out is forecast, not imported MES actuals; process route selection depends on the product. The 4–7-week durations are minimum elapsed working-day targets distributed over detailed operations, not measured process touch-times. For partially processed WIP, enter a verified remaining cycle time in the lot editor. Workstation loading uses simplified daily capacity and Monday–Friday calendars.
Three dates per lot: Original Customer Requested Date (historical), Latest Revised Customer Requested Date (customer pull-in/push-out), and Our Committed Ship Date (the earlier factory promise). The APS forecasts a separate ship date and shows differences against both customer demand and our commitment. For fast-created lots, the previous factory commitment remains NOT SET until explicitly entered; APS does not automatically approve a commitment. Confirmed Late means a modeled late forecast with confirmed supply assumptions; it is not a completed late shipment.
Portfolio — lots

Fast order entry — demand + material readiness gate

Enter P/N, quantity and customer requested date, then verify material status. APS only proposes a firm-eligible ship date once material is secured or a supplier ETA is confirmed. Unknown ETA = RED UNCONFIRMED lot and NO date.

Up to 1,000 new lots in one paste
Material availability approval — CSO / Master Planner
Earliest date all materials are available for this specific lot
Blank ETA = RED unconfirmed, no proposed delivery date

A secured date is a planner's attestation for this lot, not an automatic BOM/stock reservation. Gated ETA is a per-lot planning assumption; actual material quantity and supplier PO must be verified.

Production routing for this order — tap to select process steps

Select the product P/N first. The checklist shows every applicable standard operation in production order; only checked operations are scheduled for THIS LOT. Existing Part Master routings remain unchanged.

Select a part number to load its routing

Mandatory steps are locked. Unchecking a step changes capacity usage and routing; nominal part lead-time minimums are still retained.

Bulk register up to 1,000 lots — 9 material columns; optional 10th column: routeSteps (FAB_CUT>...>ASSY_FQA)
For new orders, use 9 columns or 10 with an optional routeSteps field. Legacy 3-column files still import but become RED Material Not Checked until each lot is verified. Customer name is a synthetic placeholder.

Customer pull-ins, push-outs & yield-rebuild recovery

Select lots from the portfolio, then change demand dates, quantities or yields. Every change recalculates shared-station queueing and material reservations.

Bulk changes to selected lots
Negative = pull-in; positive = push-out
Enter +20 or -10
Multiple WIP lots may move when shared resources are reprioritised.

1,000-lot order and recovery forecast register

Search, filter, edit and inspect every lot. Scroll the table horizontally on mobile.

Lot / Customer / Part NumbersPriorityOriginal Customer DemandLatest Revised Customer DemandOur Committed Ship DateWIP / ready goodYieldStandard CyclePlanned new starts / extra startsMaterial readiness / gated SKU / ETACandidate RTS / proposed shipForecast vs Our CommitmentDecision / constraintAction

Import / export & reproducible scenario planning

Bring your own anonymised 1,000-lot CSV with Customer Name, Customer Part Number and mandatory Internal Part Number. Import the internal part master first. Save JSON scenarios before making major changes. Do not upload real factory data to shared spaces.

Detailed CSV columns: id, customerName, customerPn, pn (MANDATORY Internal Part Number), qty, originalDate, requestedDate, promiseDate, priority, goodReadyQty, wipInputQty, currentStage, yieldPct, releaseDate. Import replaces the sample lot portfolio, keeps configured materials and resources, and treats unknown stock or WIP as unavailable—not as delivered.

HMLV APS · R1 Whole-Panel FPC & Recovery Simulator v1.9 · Browser-local detailed-routing simulation · Not MES/ERP, actual process telemetry or approved customer ship commitments.
R1.13 multi-device pilot (retains R1.12 IPQC + rework): IPQC checkpoints are configurable example control-plan records, not real automated inspection. Hold and rework currently apply to the ENTIRE WIP lot. Factory QA must approve repair eligibility and release; do not use forecasts as customer commitments.