☁ Private multi-device planning
Your orders are saved on this device. Connect an optional private cloud account to move between phones and notebook.
Read 01_START_HERE_SUPABASE.html. Requires HTTPS hosting, the R1.14 SQL schema, and a public (publishable/anon) key. Never enter your database password or a service-role/secret key here.
Fast order entry — demand + material readiness gate
Enter P/N, quantity and customer requested date, then verify material status. APS only proposes a firm-eligible ship date once material is secured or a supplier ETA is confirmed. Unknown ETA = RED UNCONFIRMED lot and NO date.
A secured date is a planner's attestation for this lot, not an automatic BOM/stock reservation. Gated ETA is a per-lot planning assumption; actual material quantity and supplier PO must be verified.
Production routing for this order — tap to select process steps
Select the product P/N first. The checklist shows every applicable standard operation in production order; only checked operations are scheduled for THIS LOT. Existing Part Master routings remain unchanged.
Mandatory steps are locked. Unchecking a step changes capacity usage and routing; nominal part lead-time minimums are still retained.
Customer pull-ins, push-outs & yield-rebuild recovery
Select lots from the portfolio, then change demand dates, quantities or yields. Every change recalculates shared-station queueing and material reservations.
1,000-lot order and recovery forecast register
Search, filter, edit and inspect every lot. Scroll the table horizontally on mobile.
| Lot / Customer / Part Numbers | Priority | Original Customer Demand | Latest Revised Customer Demand | Our Committed Ship Date | WIP / ready good | Yield | Standard Cycle | Planned new starts / extra starts | Material readiness / gated SKU / ETA | Candidate RTS / proposed ship | Forecast vs Our Commitment | Decision / constraint | Action |
|---|
Material-gated rebuild planning
Shared inventory/PO reservations apply to legacy orders. New orders use the explicit per-lot material verification and ETA fields; those entries do not automatically validate quantity against the warehouse ledger.
Finite process work-centre capacity — what-if
All part numbers use the same individual FAB/FPCA/PCBA work centres where routed. Edit daily capacity and watch lots be reprioritised.
Detailed FPC / FPCA / PCBA process routing
View every simulated operation, work-centre capacity, planned yield and WIP location. All timings and capacities are editable synthetic assumptions.
Before / after delivery impact
Compares current scenario against the last loaded or backed-up baseline.
Planning exceptions and warnings
Do not promise dates until material and capability assumptions are confirmed.
Largest delivery-date changes
| Lot / Customer / Part Numbers | Original forecast | New forecast | Movement | Material decision |
|---|
Change history (this browser)
| Timestamp | Lot | Changes |
|---|
Internal Part Master, Routing & Customer Part Mapping
Internal P/N is mandatory. Different customers may use different customer part numbers for the same internal P/N. The same customer and customer P/N cannot silently map to two different internal parts.
| Internal Part Number | Layers | Route | Gated material | Units / start | Fabrication (weeks) | FPCA (weeks) | Total standard cycle (weeks) | Sector (example) | FPC unit (mm) | Fab panel (mm) | UP / panel | Panel m² | Net layout use | FAB yield | FPCA yield | Total yield | Assigned customer P/N mappings |
|---|
1. Scenario/as-of date
2. Original customer requested date (preserved)
3. Latest customer requested date (pull-in/push-out)
4. Internal promised shipment date
5. Earliest WIP release date
6. Material PO receipt date + confirmation flag
7. Material ready/rebuild release date
8. Earliest projected RTS date
9. Forecast ship/delivery dispatch date
Operation start and finish for each station
Scenario-change audit timestamp
Calendar uses weekdays only; no holiday calendar in R1
Shipping is forecast and never an approved customer commitment without review.
Import / export & reproducible scenario planning
Bring your own anonymised 1,000-lot CSV with Customer Name, Customer Part Number and mandatory Internal Part Number. Import the internal part master first. Save JSON scenarios before making major changes. Do not upload real factory data to shared spaces.
Detailed CSV columns: id, customerName, customerPn, pn (MANDATORY Internal Part Number), qty, originalDate, requestedDate, promiseDate, priority, goodReadyQty, wipInputQty, currentStage, yieldPct, releaseDate. Import replaces the sample lot portfolio, keeps configured materials and resources, and treats unknown stock or WIP as unavailable—not as delivered.